On the second day of our whirl-wind remodel we:

– roughed in the built-in bench in the dining room
– notched out some boards an added a bullnose to the top of the basement stairs
– prepped 2 bedrooms for paint
– painted the ceiling in those same bedrooms
– had the well chlorinated (the water is currently undrinkable)
– removed the baseboards, baseboard heater covers and did some floor repair (in anticipation of day3’s big floor refinish)
– moved a bunch of boxes

Whew!

Advertisements